Adilas.biz Developer's Notebook Report - 11/1/2015 to 11/30/2015 - (81)
Photos
Time Id Color Title/Caption Start Date   Notes
No po photos available. Click to view time details.
Shop 164 Working with Nick & Bryan on Safe Harbor 11/2/2015   We skipped this meeting completely. I ended up on a phone call with Steve for almost 3 hours and then we had to take care of transferring ownership of the Adilas Shop back to adilas.biz as a company transfer between Brandon, Bryan, and Garrett.
 
No po photos available. Click to view time details.
Shop 166 Meet with Will question with current project 11/2/2015   Met with Will and we went over his project. He is on top of things and going forward. We ended up adding a flag to his queries to help search for a second corp id number. Will is creating a feature where one corp will request access to another corp based on an approval process. Looking good.
 
No po photos available. Click to view time details.
Shop 3086 Virtual Post-It Note 11/2/2015   11/2/15
Nancy Hunter
719-330-8481
Payroll-check
The five extra things and check for valid entries. Possible bail out to early.
 
No po photos available. Click to view time details.
Shop 163 Looking over sales reports with Alan 11/2/2015   We met briefly and only talked about a couple of the reports. We also talked about transitioning into fully client funded projects.
 
No po photos available. Click to view time details.
Shop 165 Meeting with Nancy 11/2/2015   Shannon and Nancy called and we jumped on a GoToMeeting session. Nancy was trying to use some of the optional 5 settings for payroll. We played with it and it looks like the code is watching for $0 values. Anyways, we made some notes and will be making the changes.
 
No po photos available. Click to view time details.
Shop 3083 General 11/2/2015   11/2/15
5:00-5:45 Small code tweaks and checking off small maintenance and to do lists.
8:30-11:15 Phone call with Steve and Heather about projects, funds, and direction
12:00-4:30 Garret and Bryan turned the shop over to Adilas. Talked with developers about cease and desist on SafeHarbor and William Bates. Walked with Bryan, talked with Steve. Talked to Alan about options and such. 30 miles.
 
No po photos available. Click to view time details.
Shop 3087 Virtual Post-It Note 11/3/2015   11/3/15
-Russell-The importance of a relationship
-Everything else could go away but if the relationship is still intact, you can make it.
-Visual project management and getting clients involved.
 
No po photos available. Click to view time details.
Shop 167 Quoting 11/3/2015   Dave, Louisa, and I got together and did a number of quotes for about 2 hours. Lots of requests for custom code on the P&L, sales reports and statistics, and advanced pricing matrixes. Lots of requests for smart cart logic and being able to program cart logic, pricing, discounts, quantities, etc. Other requests for sub inventory and pushing things to the next level.
 
No po photos available. Click to view time details.
Shop 3088 General 11/3/2015   11/3/15
4:45-5:45 Adding videos links to the main login page and linking to Shannon's exploring business function training clips. Started to work on cascading flex grid subs and updating older records if a change was made, This is an optional param but helps the flex grid set grid act as a true one-to-many relationship.
8:00-9:00 Working on auto cascading and updating flex grid tie-in records based off of changes to the sub drop-down options.
10:00-6:00 Went to Logan (30 miles), uploaded files, tested, went on a walk with Russell to talk about new changes, on a great phone call with Steve, Bryan, and Dave Forbis about ownership of the shop and distributing. Bonuses and dividends and tax implications, great conversation, signed off on a plan for Bryan for a shopping cart take over. Spent two hours quoting with Dave and Louisa, see elements of time for other notes on what was quoted.
 
No po photos available. Click to view time details.
Shop 170 Call with Calvin 11/4/2015   Great call with Calvin. We talked about his label wizard and how to best market it. We went over a couple of other spots that needed some lovin. I also promised to match Calvin hour for hour. Basically, have him finish it and I would help him market it, put up ads, and promote it. My side of the work may end up being consulting, graphic work, and helping with other bids and projects. Good phone call.
 
No po photos available. Click to view time details.
Shop 3836 Virtual Post-It Note 11/4/2015  

5:00-5:45

  • Recording notes and looking into an error for FedEx and Safe harbor eCommerce site.

8:30-9:15

  • On the phone with Steve going over options for sales, packages, commissions, and adilas shop finances and ownership. Expand...
  • On ice down dates build in black boxes to every page. Disable submit buttons. Check on the action package for a date. 
  • Use the community funded projects as a guide for needed projects.
  • Use sales as a way to generate new business and get people working.
  • Finish up the employee time clock piece tot he full level.
  • On overtime...allow a new setting to set the rules based on hours per day or hours per week. The hours per day is new...Think 8, 12 etc.(hours per day on normal time.)
  • On ice down date..use both Java Script (local) and server side logic to control it.
  • Get the graphical user interfaces done and up and online

10:30-5:30

  • Went into Logan
  • Met w/Garrett going over Sub Inventory (expand) fixing errors and giving direction
  • On the phone w/Calvin talking about the Adilas label wizard. We talked pricing and marketing options. We even talked about trading hours and helping each other.
  • Went on a walk w/Nick to talk about funding, sales and options.
  • Got Alan going on a flash my cart favorite project.
  • Talking w/Dave, Russell, etc. about options.
  • Talked with Keats and gave him a n update on funding and where we are at
  • My mom came by and we talked with her about a web page she wants
  • Pointed some the guys towards looking at older quotes and negotiating prices and terms 30 miles.
 
No po photos available. Click to view time details.
Shop 157 Work with Hypur on the API connections 11/4/2015   We need to get some testing done and also be able to collect any problems and/or logs for the Hypur API calls.

The time got taken up by other projects. No action was taken.
 
No po photos available. Click to view time details.
Shop 172 Custom Code assistance 11/4/2015   Prescott issue ? flex grid

Notes: This was not a flex grid issue. All we had to do was change https to http and it fixed the PDF problem. Of course this took a while to figure out, but we got it done.
 
No po photos available. Click to view time details.
Shop 174 API Hypur- BRANDON NOT IN THE OFFICE 11/5/2015   Brandon is unavailable to meet because he is doing coding needs.

Notes: I ended up doing a 3 hour blast on this stuff. We added in some new code, did some testing, and spent over an hour on the phone with Ignacio from Hypur on the phone. Good session and by the time we were done, we had a working API socket connection between adilas and the Hypur invoice collector API.
 
No po photos available. Click to view time details.
Shop 3837 Virtual Post-It Note 11/5/2015  

5:00-5:30

  • Research on a book that Shannon asked about. I thought that I had recorded it in my notes so I spent half an hour looking through some old entries int he adilas university site. The book she was looking for is called "Henry Hikes to Fitch burg". It is about two bears that decide to meet at a certain town that is a distance away. One bears walks and has an adventure while the other works and buys a ticket on the train to get to the destination. Anyways, a great story about the journey throughout the land we call adilas. What a journey!

8:15-9:15

  • Went to Smithfeild to work with mu mom and dad and Jared on their new industrial recycling project. We sat around the table and had our first group meeting on what the plan would be and where we are headed. Basic ideas concepts and direction.

10:00-10:30

  • Email and tech support

10:30-11:00

  • Phone calls and talking with Shannon (Go To Meeting) going over updates and tech support issues. 

11:00-2:00

  • Testing API socket connections for Hypur. Lots of debugging and on a GoToMeeting session with one of their developers making changes. Posted new code to all servers. Also posted a CSS change for their new presets. Also, I fixed the printing problem with the CSS.

3:00-8:00

  • Went to Logan
  • Emails
  • Added new project management for Hypur for dynamic payment types and general 3rd party error logs
  • Worked with Bryan on future planning for adilas black box structure
  • The view cart is going to be a happening place
  • Worked with Garrett for a couple of hours on sub inventory
  • We worked on smart group buttons for subs and cascading links. Navigation and connections around the site. It is coming together. 30 miles.

New Community Funded Projects

  • View only
  • Location specific permissions
  • Think every page
 
No po photos available. Click to view time details.
Shop 173 Working with Garrett on Sub Inventory 11/5/2015   We did a 2.5 hour session from 5:30 pm to 8:00 pm. Garrett was coding and I was helping with flow and requirements. Great session and we added a ton of new navigation and drill-down options. We also worked on coding the sub inventory to the smart group buttons. The other main thing we did was tie pages and logic between the parent and the sub inventory. Good session.
 
No po photos available. Click to view time details.
Shop 175 Quoting for Hypur 11/6/2015   Dave and I quoted Hypur on two different projects. One is for a dynamic money type (options for the cart payment section) for Hypur. The other was for an admin error log for 3rd party solutions. See other elements of time for these quotes.
 
No po photos available. Click to view time details.
Shop 176 Adilas Shop Website 11/6/2015   Get domain name and re-direct Adilas Shop page to it for Kelly sales.

Notes: We ran out of time. No action was taken. This deals with pointing different domains to the adilas servers. Basically, we have tons of domain names but they are not pointed to anything as of right now.
 
No po photos available. Click to view time details.
Shop 181 11/6/2015  
 
No po photos available. Click to view time details.
Shop 179 Working WIth G to push code live. 11/6/2015   :)

Notes: Garrett ended up pushing up the code by him self. He pushed some new changes up to data 3 because it was Friday afternoon. We didn't want to bring the whole system down on Friday afternoon/evening. Busy time.

We did end up with some errors and finally got them all fixed after a 2.5 hour session on Saturday morning. The errors were on sub inventory, bulk labels, printable quotes, and restoring quotes to cart. Garrett and Brandon worked together on Saturday to get the errors all taken care of.
 
No po photos available. Click to view time details.
Shop 4071 Virtual Post-It Note 11/6/2015  

 5:00 - 5:15  Recording hours,notes,ideas.

5:15 - 5:45 Working on the web make payment page for safe harbor,Problems with the checkout process.

 9:30 - 11:00 Went into Logan - trying to track down an error in the shipping and FedEx logic. Getting lost a bit.

-Go back to paper and figure things out.

11:00 - 12:30 Working more on ecommerce shipping and getting things ready to go. I ended up commenting out the FedEx shipping code and posting files online. I need to go back to the drawing board and get a plan. Called and left a message for Keats at Safe Harbor that FedEx shipping was disabled. Posted some new files online.

12:30 - 1:45 Working with Bryan on doing column counts on the view cart page for a black box that he is working on. We had problems with new code for sub inventory. trying to bring things up to speed.

2:00 - 3:00 Went over to Icon Health and Fitness to do an inventory tracking demo. Dave Forbis and I went to the demo. The people who wanted to see things were the running shoe department called Altra Running shoes. We got a small tour of the admin offices and found a conference room. We did the demo and answered questions. It was kinda short, but I hope it did the job. It was hard to read the guys we were demoing. I couldn't tell if they liked it or disliked it. Kinda of interesting.Dave and I talked about a bunch of things on the way back to the office.

3:00 - 4:00 Helped Bryan and Daniel Swainston on their bulk populate PDF project. Basically they have 6 PDF documents that need to be saved per person. Kinda a fun project. I also worked with Dave  Forbis on some quotes for dynamic money types and error logs for clients. I also worked with Alan on his project for switching between Flash and HTML for my cart favorite buttons. Alan is doing a great job and it is easy to follow his thought pattern and notes. All of my guys are doing much better as they start writing down notes and planning things out. I've been impressed. 30 miles.

- Quick note, Bryan has really been making some leaps and bounds lately in his programming knowledge.

- Things change all the time - root and anchor yourself in the concepts and doctrine, they will stay the same. The processes and procedures will change as needed. Make sure that you are anchored and rooted deep enough.

 
No po photos available. Click to view time details.
Shop 180 Meet with Altra 11/6/2015   Brandon and Dave went to Icon Health & Fitness (in Logan) to meet with the Altra Running Shoes department at Icon. We met with a couple of guys by the name of John and Chett from the sales division of the Altra section.

We did a small demo and they wanted to see what was available by way of an EDI (electronic data interchange) or API socket type interfaces. Basically, they wanted to stay with their older system but push data to us to get at reports and other custom sales matrix and stats. Their current system did sales and provided lots of data but was not very flexible on the reports and building custom options. Interesting meeting.
 
No po photos available. Click to view time details.
Shop 182 Bryan black box template setup 11/6/2015   Bryan black box template setup

Notes: This meeting got pushed back due to the fact that making a change would require numerous other changes on existing black boxes and existing pages. We did talk about some concepts but we did not do any major code changes.
 
No po photos available. Click to view time details.
Shop 4072 Virtual Post-It Note 11/7/2015  

9:00 - 11:30 on the phone with Garrett going over errors and bug fixes for sub inventory. Lots of work with validation error handling, and standardization. We also  had some good  conversations about getting good data and logic higher on the page vs. right on the middle of the page output.

- Went to a family history fair and Mindy Pratt was the presenter. What a good job - Simple PowerPoint, great ideas, and down to earth presentation. i loved it. I could using adilas for family history very easily using customers, elements of time, sub dates and time, sub notes and comments, flex grid, photos, and media content.

12:45 - 1:15 Recording notes.

-BE YOURSELF 

 
No po photos available. Click to view time details.
Shop 4073 Virtual Post-It Note 11/7/2015  

- On sub inventory - we need to move all data pulls and logic up higher into main methods vs. running tons of things mid stream in the middle of the output.

- Reconfigure the whole sub inventory thing to help it be smooth and easier to manage. 

-Pull all logic, counts, and settings before trying to do any out put. That way we could know what we need prior to doing any output. Basically, get the logic and data as preped as possible before out putting anything. That helps us separate logic, data, and display.

 
No po photos available. Click to view time details.
Shop 4075 Virtual Post-It Note 11/9/2015  

10:00 - 6:00 Went into Logan. Daniel, Bryan,Dave, Bank with Bryan - see elements of time  - 30 miles.

9:00 - 10:00 Work with Daniel on data import for the Green Door. Metro.

 
No po photos available. Click to view time details.
Shop 191 PDF Sign off 11/10/2015   We did the first round of sign-off's. The rest will be details and going through things line by line.
 
No po photos available. Click to view time details.
Shop 4076 Virtual Post-It Note 11/10/2015  

 Went into Logan. Daniel sign off an PDF's talking to Bryan about sign off on QR codes and merging files into master.

-Maybe looking stuff from the shop record.

 
No po photos available. Click to view time details.
Shop 192 Process development 11/10/2015   Code pass off checklist/ Johny's code pass-off

Notes: Bryan and I looked at the code and made a couple of changes. We have rescheduled and will look at things tomorrow.
 
No po photos available. Click to view time details.
Shop 4374 Virtual Post-It Note 11/11/2015  

-fly  by get closer.

-details and  testing record pages commit and push

-upload and test

-branch clean-up record on element of time recap.

-(10:30 - 1:30) Logan, emails, phone calls, code sign-off with Bryan, helping other guys with projects. 30 miles

-(4 - 4:30) tech support

-(5 - 6:30)tech support, emails, and tracking down some small bugs on the mini invoice. Running database updates for sub inventory. Added some code ot help out the page ot handle pagination. 

 
No po photos available. Click to view time details.
Shop 194 Black Box- Mini Receipt 11/12/2015   Need help in getting files off data 2 and help out black box creation flow.

Notes: Met with Daniel and we looked up how the rewards points were stored for Blum. We actually logged in and looked around and followed older code from Eric's reward points. We even followed logic for the point redemption process.

The original file was: custom/custom_blum_rewards_program.cfm

Good session and wrote out some basic steps. Here is a light overview for the record:
- What server?
- What corp id?
- Other special id #'s?
- What files are being altered, added, or deleted?
- What are the differences between test and live?
- What is your to do list for the project?
 
No po photos available. Click to view time details.
Shop 195 payables consolidation 11/12/2015   Pass-off plan

Notes: Met with Bryan and went over a few things. Here are some more ideas for code planning and sign-off.

- What branch are you on?
- What is your budget? Dollars? Hours? Max/Min?
- How will you spend your time?
- Recommendation: Step away from your computer to do some planning. It may help a ton.
- What is your plan? Overview/General
- What is your plan? Technical/Details
- What is your plan? Layout/View/Show
- What are the requirements?
- What are the extras, options, or possible add-on's?
- What are the wish list options? (dream a bit)
- What are the problems, hard things, or unknowns?
- Did you think about re-use or making things dynamic (code once, use many)?
- What are your client's goals? Timelines, budgets, milestones, etc.
- What are your goals? Timelines, budgets, milestones, etc.
- Are you doing the whole thing or are you subbing things out and getting help? If yes, where/when/who/what/how much? If no, make your plan and play accordingly.
 
No po photos available. Click to view time details.
Shop 4375 Virtual Post-It Note 11/12/2015  

-( Planning for code projects)

-What server?

-what corp id?

-other special id numbers?

-need to keep track of what files are being altered, added, or deleted?

-what are the differences between test and live.

-whats your to do list.

(END planning for code projects)

-with Bryan what branch are you?

-How can you renew this?

-what's your plan?

-technical aspects?

-what would make it move dynamic?

-what is your budget and how will you spemd that?

-What goals?

-possible problems/

-expand options?

-wish list?

(TIME)

-(9:45 - 11:15)Logan - worked with Daniel on some project planning. See Element of time number 194 in the adilas shop. Good notes. 30 miles

-(11:15 - 12-:00_ working with Bryan on some project planning. More good notes. See element of time number 195 in the adilas shop.

-on the adilas GPS core...add some basic stats on the graphical home pages and sub home pages.

-(12:00 - 6:15)phone calls, tech support, and helping guys with their projects. worked with Dave, Russell, Bryan,Daniel and Alan. Dave and Russell were talking about elements of time and I got to chime in and share some vision about watchers, feeders, automated financials, and history of elements of time. I had fun rolling things back and talking about the why behind the interactive map, 3D financials, world building, and how elements of time is somewhat of a precursor for other sections.

-(9:15 - 10:00 PM) paying bills and recording expenses.

 
No po photos available. Click to view time details.
Shop 4376 Virtual Post-It Note 11/13/2015  

(10 - 11) Logan, emails and tech support 30 miles

(11 - 5:45) see elements of time 

-helping Bryan with consolidates payables and array of structs, accountant, meeting with Jared to look at videos, Jake on sub categories for parts and items, Danial on populating PDF's Russell on photo galleries, Bryan with more logic.


 
No po photos available. Click to view time details.
Shop 199 Meeting with the accountant 11/13/2015   There will be an accountant coming in to give us all a bunch of tax saving tips and tricks.

Notes: The guys name was Jared and he did a little over an hour long presentation. Good stuff. We talked about soul proprietors, LLC's, S-Corps, C-Corps, etc. We went over piercing the corporate veil, home offices, mileage deductions, meal deductions, record keeping, and some other basic tax tips and tricks. One thing that he mentioned that caught my interest was about R&D for software development. There is actually a possible tax break for writing code and doing R&D. Anyways, we may need to check in to that later on. Good session.
 
No po photos available. Click to view time details.
Shop 201 talk about photo galleries 11/13/2015   Met and talked with Russell. We talked about photo gallery concepts and looked at a number of possible photos that I would like to have and use for training and sales demos. Basically, Russell and Chris Johnnie want to put my photo gallery up on their site so that they get more pings. Basically a tool that anybody could use to get at the photos that I like to use. We decided to circle back around and do another session on this subject next week.
 
No po photos available. Click to view time details.
Shop 202 Talk about new project 11/13/2015   Met with Jake to go over the project. We did a full whiteboard session and talked about part categories and sub categories. We determined that we would add two new fields to the part category table. They would be a self-linking id number to help with subs and subs of subs. We will also add a sort value to help with sorting categories based on subs.

We also talked about doing some light research to checkout how far this little database change would cascade. The original price tag on this project (time # 37) is $900. I was instructed by Dave to cut a check out the Adilas Shop checkbook for the first half or $450. See E/R # 53 for that first payment.
 
No po photos available. Click to view time details.
Shop 4379 Virtual Post-It Note 11/14/2015  

-(12:00 - 5:00)Daniel came over and we worked on different projects. We did some custom PDF stuff and worked on mini invoices with customer loyalty points.

-(11:00pm - 11:30pm)looking the adilas API socket stuff.

 
No po photos available. Click to view time details.
Shop 4382 Virtual Post-It Note 11/16/2015  

-(10 - 11)Logan, meeting with Russell and talking about scheduling some time to work on projects. On the phone with Steve going over projects and funding. 30 miles

-(11 - noon)meeting with Nick to go over a project for a generic #rd party solutions error log and back end admin report interface.

-(noon - 1:30 pm)working with Russell to get images for a photo gallery

-as part of the photo galleries we went through some old PDF's for the developer's notebook stuff. Fun session.

-(1:45 - 4:00)met up with Kris Kofed (consultant) and went to a meeting with Beaver Mountain to talk about their ski school. We met with Debbie (ski school director), Travis (mountain manager), and Kristy (office manager). We first talked shop and drew some things out on paper. Mostly concepts of one-to-many-relationships, players, groups, and mixing different pieces. Travis and Kristy were catching on pretty quick but Debbie doesn't know computers that well and you could see some panic in her tone,questions, and appearance. She seemed to relay as we went along and talked about options, features, and benefits of moving into a system and digital model. Great meeting and we set a  model. Great meeting and we set a new meeting time for next Monday to present a full proposal and plan for what we will do for them.

-(4:15 - 6:45)Went back to he office and told the guys about the meeting with Beaver mountain. I then worked with Daniel on some code sign off of Blum and Green Door out of California. The session went very well until we ran into a bug on one of the loyalty points calculations. We spent over an hour and a half trying to fix that bug. We finally got it fixed and got everything all wrapped and done.

 
No po photos available. Click to view time details.
Shop 197 Chris Johnnie 11/17/2015   Talk about Adilas for schools

Notes: Russell, Chris, and I met to talk about adilas going into the school arena. Lots of potential there.
 
No po photos available. Click to view time details.
Shop 208 working on the sales page 11/17/2015   Russell and I worked through a ton of old developer notebook pages and grabbed out sketches and notebook drawings. Russell is going to help organize them. As we grabbed drawings, I tried to help Russell see why each one was important or what I was trying to convey with the drawing and/or sketch. I'm not sure how much he enjoyed it, but I was having fun.
 
No po photos available. Click to view time details.
Shop 4383 Virtual Post-It Note 11/17/2015  

-(10:00 - 6:15 pm)See E of T's - also did a session with Todd Williams and talking about eCommerce 30 miles.

 
No po photos available. Click to view time details.
Shop 213 Receivables consolidate 11/17/2015   Receivables consolidate- Bryan

Notes: Bryan and I went through things line by line and tested and dumped code. We talked and worked through some great things. Bryan is really catching on and getting more comfortable testing and building good code. Great session.
 
No po photos available. Click to view time details.
Shop 210 Quotes 11/17/2015   Dave, Lousia, and I did some quotes online. Dave and I talked and Lousia typed and took notes. Lot's of good requests and ideas floating around.
 
No po photos available. Click to view time details.
Shop 200 Garrett about FedEx 11/17/2015   We ended up working on sub inventory vs. fedex. Good stuff and making progress on the different pieces. Garrett was coding and I was helping with navigation and requirements.
 
No po photos available. Click to view time details.
Shop 205 Review plan for sub categories 11/18/2015   Got together with Jake to go over the sub part categories project. We did some planning and we then worked on the database scripting page to help update things. After that we started looking at the source files and how things cascade. We made a plan to get the easy part done and then to get back together and look at the other pages that need to be checked and touched. Good session.
 
No po photos available. Click to view time details.
Shop 4384 Virtual Post-It Note 11/18/2015  

-We need to expand out the API fields like the argument description to hold more characters. Currently the max of 255 gets used up too quickly. We need more room.

-(5 - 5:45 am)Small fixes for advance time search sort orders. Also fixed a trim problem with adilas API socket connections. Trying to help things out.

-(9:45 am - 3:30 pm)Logan, see E of T's, Jake-planning sub pert categories, Nick Hyper going over plan 3rd party error logs - Russell and photo galleries - Bryan help on projects - Alan looking over his HTML my cart favorite 30 miles.

-(5 - 6 pm)talking with Andrew from kabbage about some funding options. Playing with some numbers and scenarios.

 
No po photos available. Click to view time details.
Shop 209 Meeting about sales page 11/18/2015   Russell and I did a final session to push all of the images into small folders for sales, concepts, training, developers, and future ideas and projects. Lots of fun seeing how each things works with and combines with the next concept to help create the whole. The session went a little bit long but we were able to finish up the initial groupings of the images. Fun to start harvesting the ideas that have played in over the years. I'm excited.
 
No po photos available. Click to view time details.
Shop 218 Working on some Hypur stuff 11/18/2015   Wasn't able to get the Hypur stuff. I ended up working with Bryan on his consolidation project and then helping Alan with his HTML my cart favorite buttons project. Busy times.
 
No po photos available. Click to view time details.
Shop 196 Meeting Heather in town for an appointment 11/18/2015   Went to the doctor's appointment with Heather and we found out that we are having a little girl. We are expecting and due in the end of March 2016. Fun!
 
No po photos available. Click to view time details.
Shop 214 Brainstorming on flow for the Beaver Mountian project 11/19/2015   Those who want to be part of the Beaver Mountain project - we will be meeting and going over flow and budgeting for the online sign-up and class registration portion of the Beaver Mountain Ski School project. The plan is to do the initial planning and prep work for a presentation back to them that is scheduled for next Monday (11/23/15).

I have asked Daniel to be the point person on the project. I have also asked Bryan to be one of the developers on the project. Others are welcome as you see fit. Thanks!

Notes: We had a great brainstorming session. We had Nick taking notes, Daniel and Bryan helping, and Kris Kofoed even came and chimed in. Russell had a few comments and we filled up the white wall twice doing concepts and flow. Great session. See elements of time # 124 for details.
 
No po photos available. Click to view time details.
Shop 222 Working on Hypur stuff 11/19/2015   Didn't happen. The Beaver Mountain planning session took precedence.
 
No po photos available. Click to view time details.
Shop 4385 Virtual Post-It Note 11/19/2015  

-add some new personal settings for elements of time homepage.

-add a new horizontal time slot view for elements of time. This would be people down then left side and time across the top.

-(5:00 - 5:15)Recording notes and getting organized.

-(5:15 - 5:45)uploading files and running API updates for Chris Dunsey.

-(9:30 am - 8:30 pm)Logan, see E of T for details - Daniel, Nick, Bryan, and I were white boarding and brainstorming on Beaver Mountain and lessons/class based eCommerce and staffing flow. Kris came and helped - meeting with will on application universe plus world levels.

-Signing off on code with Bryan on his consolidated receivables and consolidated payables - Quotes with Dave and Louisa - working with Garrett on sub inventory. Long day but good stuff.

-(9:30 pm - 10:00 pm)Went to my parents house and helped them get set up on a new adilas system for and industrial recycling business. They ave great helpers and cheerleaders. I am so blessed.

 
No po photos available. Click to view time details.
Shop 221 Setting up permissions for cross corp access/ new project 11/19/2015   Met with Will and setup two new permissions. One is a super high level admin permission (universe level) that needs to be turned on. The other is a lower world level permission for doing the cross corp actions. We cascaded the settings all around to the different servers. We also talked about some other projects that are in the wings.

We also talked quite a bit about the possibilities of creating the application flex grid to help bridge and join different businesses, software packages, and different data together.
 
No po photos available. Click to view time details.
Shop 223 payables consolidation- Bryan 11/19/2015   code pass-off/push live: payables consolidation.

Notes: More work going through things line by line. This project is quite deep and deals with lots of complex data sets. We have variables, lists, arrays, queries, and multi-level structures. Pretty deep.
 
No po photos available. Click to view time details.
Shop 211 Quotes 11/19/2015   Working with Dave and Lousia on quotes. We had a number of requests for new limited permissions, custom reports, black box projects, and our first request to fully go to the page setting level for every items on the add/edit customer page. The other topic seems to be dummying down the shopping cart view and interface. Lots of requests there.
 
No po photos available. Click to view time details.
Shop 217 Working with Garrett on sub inventory 11/19/2015   Spent a couple hours with Garrett working on sub inventory. We also looked at and made a small plan for getting the round one stages done, up, and online. It is fun to see it coming together.
 
No po photos available. Click to view time details.
Shop 234 payables consolidation- Bryan 11/20/2015   More working through things line by line. This has been a pretty deep project. We ended up working together for about 3 hours today. I was supposed to be working with Garrett on FedEx shipping but Garrett ended up working with Alan and I worked with Bryan on his project.
 
No po photos available. Click to view time details.
Shop 233 Safe Harbor/Paypal and Fed-Ex 11/20/2015   Working with Alan

Check bottom of email other requests from Safe Harbor.

Notes: Garrett and Alan worked together on the FedEx stuff. I ended up working with Bryan on his consolidated financials project. Garrett was coding and Alan was watching and following along.
 
No po photos available. Click to view time details.
Shop 2885 General 11/20/2015   11/20/15
5:15-5:45 Working on Hypur tax charges
8:15-9:30 Finished up some stuff for Hypur and tried to push up files. Had an FTP and server error and had to call tech support.
10:15-5:30 Logan-Nick on the 3rd party error logs, Bryan and consolidated receivables and consolidated payables, Daniel on the Beaver Mountain Project. Garrett and Alan worked on PayPal and FedEx stuff for Safe Harbor. On the phone with Keats...kinda heated. On the phone with Steve going over funding. Helped Bryan sign-off on some code. Lots of line by line testing and explaining of things. All of the guys did some learning and growing. 30 miles.
11:00-12:00 (Midnight) Another small fix for Hypur. They wanted me to roll back some changes. I also prepped some Adilas API changes and documentation. We are starting to get people pushing on the API a bit. It's not done, but it's coming.
 
No po photos available. Click to view time details.
Shop 236 Phone call with Steve going over funding 11/23/2015   Steve and I chatted for over an hour on funding, a Kabbage.com loan, and ways to help things as we go forward. We are hoping to use this loan as somewhat of a start over or wipe the slate clean move. Anyways, good stuff.
 
No po photos available. Click to view time details.
Shop 239 Push Code Live 11/23/2015   More work on project and found that we needed to filter the main queries a bit more. Too many records under certain situations. Unable to sign-off at this point.
 
No po photos available. Click to view time details.
Shop 240 Push Code Live 11/23/2015   Duplicate - See other entry for notes.
 
No po photos available. Click to view time details.
Shop 215 Meeting with Beaver Mountian to show our plan and proposal 11/23/2015   We will be presenting our plan and proposal to Travis (mountain manager), Debbie (ski school director), and Kristy (office manager). At that point, we are hoping that we will get the full go ahead on the project.

Notes: Daniel & Russell went with me to the meeting. Daniel did the main presentation and each of us chimed in at different times. We proposed 4 different options. They were: $1550 - simple internal fixes. $2300 - online class registration. $1000 - waiting list option using quotes. $2000 - adding in paperwork and digital waivers.

At the end of the meeting. They were leaning towards the simple internal stuff plus the digital waivers. Also, by way of note, Kris Kofoed was there and helping out as well. Good meeting. We officially still don't have the full go ahead, but it is getting closer.
 
No po photos available. Click to view time details.
Shop 242 Working with Bryan signing off on consolidated payables and receivables 11/23/2015   Working with Bryan to limit the number of records coming back. Basically, we were looping over way too many records and it was crashing the page. Lots of experimenting to get things limited or paired down. We ended up tweaking the main method call to get rid of all of the crazy dynamics in the multi level loops that we were doing later on. Right before we finished, we got a call from Hypur and they needed some immediate help. Bryan had to work on some of the new changes by himself.
 
No po photos available. Click to view time details.
Shop 2886 General 11/23/2015   5:00-6:00 Recording expenses, bills, and invoices.
8:00-8:15 Emails and tech support.
9:30-10:15 Went into the office. On the phone with Steve going over plans, vision, and funding options. We talked a lot about possibly using a Kabbage.com business loan to get some things paid off and start over in some ways. 30 miles.
10:15-1:15 Working with Nick on the Hypur 3rd party error log section and special error logs. Also worked with Hypur on some testing and tax stuff. I helped Daniel prep for our meeting and wrote some bills.
1:30-3:00 Went to meet with the Beaver Mountain people about using Adilas to help track their ski school lessons. Daniel and Russell went with me. Daniel was the main presenter of our plan today. That was kinda fun. Russell chimed in and it was a good meeting. They are about to give us the go ahead.
3:15-4:15 Working with Bryan to get limited lists of customers for our special consolidated receivables reports. Lots of experimenting and trying things.
4:15-6:45 Working on the Hypur invoice collector API. Part of the time was on the phone with Ignacio from Hypur doing testing and trying to get things connected and passing correct data. We had to totally redo a whole portion of the code to make it work.
10:15-10:30 Recording notes in my notebook about the day. Busy times.
10:30-11:00 Fixing some new requests for Hypur and their invoice collector API. Added some cash contacts, changed due options, and added a new drop-down for merchant types as a part for the third party page settings.
 
No po photos available. Click to view time details.
Shop 244 payables consolidation- Bryan 11/24/2015   Bryan and I worked and got the first round of code done for the consolidation stuff. We salvaged code off of the branch and pushed things live. Prior to that, we did spend quite a bit of time limiting and filtering queries to help reduce the possible load for both payables and receivables. After we got things pushed, we spent some time talking about cycles, wages, and options for the future. Things have been pretty tight lately.
 
No po photos available. Click to view time details.
Shop 2887 General 11/24/2015   11/23/15
9:45-5:45 Went into Logan. Talked with Calvin for a while about progress and different projects. We are planning a session to work on his label wizard stuff after Thanksgiving. He seemed to be in good spirits. I worked with Alan Williams on Safe Harbor and flat rate shipping. Trying to follow logic in and through the ecommerse system. I then worked with Bryan and we signed off on his code for consolidated receivables and consolidated payables (multi corp financials). After that, Bryan and I talked about numbers and projects. He isn't making very much and things are tight right now. Things are tight around the board. 30 miles.
6:45-7:30 On the phone with Steve going over our days and where things are headed. We talked a lot about upcoming projects and funding options. I got approval to get our first business loan from an online funding company called Kabbage.com. We also talked a lot about our plans going forward and how we want to play. Good phone call.
8:30-10:45 Went in and applied for our first business loan from Kabbage.com. We are trying to get $30,000. All of that is going to go to developers to help pay off debt and work that has been done. As part of the process, I had to read a 15 page legal document and contract for the loan papers. I read, printed, and signed the loan agreement. It is a 12 month loan or line of credit. After that, I did some light budgeting of where the funds will go.
 
No po photos available. Click to view time details.
Shop 245 Hypur 11/25/2015   Nick and I worked on the 3rd party page. We added pagination, a new archive method, a loop to do the archives, we added a high universe level permission, and went over looping over structures and the form scope. Great session.
 
No po photos available. Click to view time details.
Shop 246 Safe Harbor/Paypal and Fed-Ex 11/25/2015   Keep chugging along!

Notes: Alan and I met for a little over 3.5 hours. We did quite a bit of work on the flat rate shipping per line items. We also changed some admin corp-wide settings to help make the shipping stuff more clear. We added a number of visuals on the shipping info and added some logic to help auto clear the cart if no items have been found. We also worked on logic for both adding and updating a items in the cart. All of the new changes were somewhat dealing with shipping settings for ecommerce.
 
No po photos available. Click to view time details.
Shop 2941 General 11/25/2015   6:15-6:30 Recording notes from yesterday from memory and from post-it notes.
6:30-9:00 Working on some changes to the Hypur API for the invoice collector. Made a number of changes and got on a phone call with Ignacio from Hypur to test and push things. Small GoToMeeting session over code.
10:15-5:45 Went into Logan to work with my guys. I had meetings with Nick Vaughn, Alan Williams, and Bryan Dayton today. Pretty quite and we got a lot done. Nick and I did a good two hour sessions on the third party error logs. We tightened up the page, added a new admin permission, looped ober things to help archive data, and added addition search options and functionality. We are thinking to use the new error log tool to track employees who clear shopping carts as well as other error logs. After that, I worked with Alan for over 3 hours on shipping settings for eCommerce. We were working on fixed notes, flat rates per item, and other shipping settings. I worked with Bryan on a custom invoice job for a company called A Touch of Style. They provided us an Excel based invoice and we had to convert ti into a web based invoice. Daniel was in today as well but working on his own projects. Quiet but busy day, 30 miles.
9:00-10:00 Online recording note inside of elements of time for the Adilas Shop. Clearing out the Brandon Time entries and appointments.
 
No po photos available. Click to view time details.
Shop 243 Meeting with Calvin to do some marketing on the label wizard 11/27/2015   Meeting at Calvin's house to work on ads, videos, stuff.

Notes: Went out to Calvin's house and we worked on a bunch of stuff to help promote the label wizard. We built and ad, got YouTube video links, and talked about where and how we wanted to set things up. Great session and I learned a lot about Calvin.

For fun, we talked about tons of other stuff besides work. We talked about past jobs, art, painting, joint projects, upcoming projects, etc. It was a nice casual day and we still got quite a bit done. Good stuff.
 
No po photos available. Click to view time details.
Shop 2942 General 11/27/2015   7:00-8:00 Responding to texts and email. Going through elements of time and cleaning up the Brandon Time entries in the Adilas Time Shop site.
9:00-3:00 Went out to Lewiston to work with Calvin on his label Wizard product. The first hour and a half we just chatted and talked about projects, options and needs. We then got into the label wizard. We wrote down some specs, got YouTube video links and got some graphics coming back from Russell. I worked on YouTube media/content pieces and a new ad for Calvin. He worked on other projects and helped give me direction and feedback. Great day. I also got to know some more things about Calvin and some of his background. The day was busy but casual at the same time. 20 miles.
5:00-5:30 More work on Calvin's label wizard ad for the main login page.
 
No po photos available. Click to view time details.
Shop 251 Meeting with Danny Shuford to talk about CSS stuff 11/28/2015   Had a GoToMeeting session with both Danny and Steve to go over custom CSS and custom header/footers. Good session. We also tweaked a few things on Danny's local machine to help him get his development environment up to speed and ready to go. Good session.
 
No po photos available. Click to view time details.
Shop 2943 General 11/28/2015   2:00-4:00 See EOT #251
4:00-4:30 On the phone with Steve going over projects, funding, and direction. Lots of good stuff coming down the pipeline in the next couple of months.
5:15-8:00 Writing out checks and paying off thousands and thousands of dollars worth of payable owed to developers. We got a Kabbage.com business loan and spent the whole thing transferring debt from Adilas developers to the Kabbage business loan. That was good to get some of that all taken care of. This will also light a bit a fire under our rear ends to get things under control and all paid off.
 
No po photos available. Click to view time details.
Shop 250 Hypur Review/Sign off 11/30/2015   Met with Nick and we signed off on his code at his computer. We went through as much as we could and then we merged his files into master. We then worked on my computer to go through the integration process. We spent some time working on the history capture of the clear cart action. Good session.
 
No po photos available. Click to view time details.
Shop 254 Custom invoice- Bryan 11/30/2015   Answered some small questions for Bryan on his custom invoice for A Touch of Style. The invoice format was taken from an MS Excel document. It has certain requirements and specific formatting. Basically, I was just helping Bryan with some direction and where to get the information and data.
 
No po photos available. Click to view time details.
Shop 247 Working with Steve on sub inventory 11/30/2015   Worked with Steve on sub inventory. We spent a lot of time tracing steps and trying to figure out what values were what. We ran into some errors and ended up starting back at the very beginning. We are trying to smooth out the process. The biggest frustration was dealing with different coding styles and trying to interpret intentions and direction. Good session.
 
No po photos available. Click to view time details.
Shop 252 Working on sales page 11/30/2015   working on sales page

Notes: Russell opted to give the session to Nick so that we could finish up the sign-off for Hypur and the 3rd party error logs. Alan allowed us to take up an hour of his time as well in order to finish up. Nick and I added all of the code to help catch the clear cart logic as well as the normal Hypur API calls and possible errors there. Good session and we got it done to the level that I signed off on the project.
 
No po photos available. Click to view time details.
Shop 256 Code Sign off 11/30/2015   Sign off code for Flash/HTML buttons

Notes: Worked with Alan and started into the process. Lots of detail work. We worked with the login and session stuff, we then spent most of our time working on the new my settings (personal settings) for switching between flash and HTML buttons. The other new setting was dealing with who's my cart favorites to use by default. Anyways, a great session and lots of talk about flow, detail, and how we can work together as a team.

I'm kinda worried about how detailed I tend to be. I really need help, and we need detail, but how much is needed and how much is healthy? Those are the questions. I almost take things to a non healthy level due to details and almost an OCD (obsessive compulsive disorder) level. We'll have to find a good mixing point and a good balance.
 
No po photos available. Click to view time details.
Shop 2944 General 11/30/2015   11/30/15
5:15-5:30 Emails and small to do list stuff.
8:15-8:45 Emails and light follow up on things.
10:00-7:00 Went into Logan. Got Russell his checks and talked with him a bit about pros and cons of having help. We talked about some of the challenges and Russell just listened. I worked with Nick on sign-off for the 3rd party error logs. We started getting in to integration for the clear cart logic. Next I spent a 2 hour block with Steve working on sub inventory and helping it to be a smoother process. Lots of tracing steps and trying to figure out what is needed and how we can help. Encountering some small errors, problems, and difference in coding techniques. Working through things. After that, Nick and I did another session on the 3rd party error logs. We added all the code for catching clear cart actions as well as actual Hypur API call errors. The clear cart session took a bit of time as we had to break things up into smaller pieces in order to show both main details and individual line items. After that session with Nick, I worked with Alan Williams for about 2 hours on his new settings for switching the normal Flash my cart favorite cart buttons with a non Flash or plain HTML and CSS type button. We got into the details and started at the source of the change dealing with new personal settings. Busy day today. The other thing that was going on today was Bryan was working on an a custom invoice layout or A Touch of Style. It included a special layout, photos for line items, back order stuff, shipping stuff, etc. It is looking pretty good.