Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Assigned To: Brandon Moore
Created By: Brandon Moore
Created Date/Time: 3/1/2023 9:38 am
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
Priority: 0
 
Time Id: 9926
Template/Type: Brandon Time
Title/Caption: Adilas Time
Start Date/Time: 3/30/2023 8:45 am
End Date/Time: 3/30/2023 11:30 am
Main Status: Active

Sorry, no photos available for this element of time.


Notes:

WordPress was down and this caused our main website to be down. I contacted Chuck via text, then a phone call. Sent emails to Wayne with some instructions and suggestions from Chuck. Trying to get things figured out. Luckily, you could bypass the main website and do a direct login by changing the URL (web path) to the login page.

Jumped on the GoToMeeting session and was having audio problems. Cory had some questions about the adilas label builder and getting images pulled in. Kelly needs some sub inventory reports. Some of that gets pretty dynamic and pretty deep. After that, John and I talked about our WordPress site and getting our stuff off of an outside content management software package, WordPress. We couldn't get ahold of either Wayne or Chuck to get help. We need to get some documentation from both or have John help with that documentation. Our eventual goal is working towards standardizing and using best practices for all of our developers. Constant processing of pivoting, updating, and changing to fit and fill our needs.

Chuck was able to meet with me and I jumped back on the GoToMeeting session. John jumped back on as well. We were trying to fix the WordPress stuff for our site. Chuck was helping John try to navigate to a certain file folder and make some changes. We kept running into issues. Cory jumped on and we made a quick fix for her on a cross corp invoice to PO transaction (special cross corp page). Once we finished that up, back on with John going over plans and what not.