Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Eric and I jumped on a phone call. He and I were talking about the inventory snapshot project (was called the mini aggregate project for inventory quantities). Talking through ideas, requirements, plans, and even deep backend tech stuff. We talked about different phases and parts of the project. Concepts, planning, development, future rounds, and even deployment. Good stuff and making progress. If we get everything planned out and going in the right direction, I was telling Eric that we could even do a mini sprint or small team effort to cascade the new logic to all of the pages that use parent inventory and sub or child inventory. Basically, any pages that would be dealing with the item quantities and inventory snapshot stuff. That could be quite a few pages. If we have a guideline or a handrail, we should be able to make that happen. |