Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Quick meeting with Dustin to get him going on his local box. He was running into an error. We got it fixed and he is on his way. He is almost done with his production samples project. He showed Steve and I a quick demo. He and Steve will be getting together later to discuss the next steps and other projects. Steve and I were talking about breaking up projects into smaller and smaller pieces. This may not apply to everything, but we are really trying to take better bite sized pieces vs trying to stuff everything that you can into your mouth (not really - but an analogy). We are going to try to release code almost weekly or daily where possible. We may need to disable it or limit it, but we want it to be pushed into master when it can be. That helps us limit the amount that we build and then put on a shelf (virtually in a code repository). Baby steps or progress by degrees. Steve and I also talked briefly about other plans and what not. He was going to be calling Kelly this morning to go over things with her. I ended up doing emails and light internal tech support with our developers. Small stuff. |