Notes:
|
When I joined up, there was a sales meeting going on. There were 8 people on the meeting. I was mostly a fly on the wall, but awesome to listen and hear what was going on. Marisa was leading the meeting and had an agenda, notes, follow-ups, etc. Awesome stuff. These were the people on the meeting: Brandon, Marisa, Steve, Audrey, Chuck, Danny, John, and Sean. At 9:30, the sprint scrum teams joined up and had their daily standup meeting. We had Brandon (me), Bryan, Marisa, Alan, Chuck, Eric, John, Cory, Sean, and Wayne on the second half of the meeting. I took some other meeting notes and recorded them inside of adilas. Towards the end of the meeting, they were going over some light trainings and what not. Two small meetings with some of the main players within the adilas system. Both sales and developers teams. |