Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Assigned To: Brandon Moore
Created By: Brandon Moore
Created Date/Time: 2/22/2021 9:20 am
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
Priority: 0
 
Time Id: 7540
Template/Type: Brandon Time
Title/Caption: Projects
Start Date/Time: 3/30/2021 2:00 pm
End Date/Time: 3/30/2021 5:00 pm
Main Status: Active

Sorry, no photos available for this element of time.


Notes:

Emails and recording notes.

Reviewing a 7 page document from Steve McNew - internal consultant and software process engineer. I have a copy of the document saved on my local computer. Some new and exciting things. Mostly a structured refinement of some of concepts, methods, and practices. Trying to become more structured and standardized in our approaches and philosophy.

I also had a half an hour phone call with Steve Berkenkotter. Part of it we were going over the document from the other Steve (software consultant), talking about funding, and what are the next steps for us as a company. We talked about scale, stepping up to the next level, allowing others to help handle small teams and sub projects, and concepts of the data assembly line.

We keep seeing a need for things to be open and flexible, then coming together and getting more rigid, and then expanding and contracting again, over and over. This same process will be needed as we go up the chain, clear into aggregated or master systems at the enterprise levels. These are the virtual flex bubbles or flex pods that we keep seeing. It all comes back to the data assembly line type concepts. Kinda fun to see it go full circle and even to keep expanding beyond the simple transactional corporations and worlds. "O|O|O" (pretend that those are little flex pods or flex bubbles - the O's are the flexible or open areas (based on phases and permissions), the | (pipe symbol) is the checkpoint or divider for the next level.

More info on the data assembly line concepts - help file