Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Four of us were on the meeting to go over projects. We had Cory, Eric, Steve, and I, all in together going over plans and options. Lots of discussions about business verticals, MVP (minimal viable products), themes/skins, and bulk back box type options. We also had numerous talks about picking up low hanging fruit, doing gap analysis (we are here and we want to be over there - what is the gap), building the core on rules, assignments, and settings. Lots of good direction. |