Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Uploaded Media/Content & Other Files
(1)
|
||||
Media Name | File Type | Date | Description | |
PresentationGalleryOutline.docx | Doc/Text | 1/21/2020 | Today we were working on the Expense Tracking section of the outline. |
Notes:
|
Shannon and I met up to work more on the outline for the sales and presentation gallery. See attached for the current working outline. Today we spent some time on the expense tracking section. Towards the end of our meeting, I got a call from Wayne dealing with an SSL (secure socket layer) for the data 7 server. He tried to walk me through some things and then we got on a GoToMeeting session. It kept giving us an error that needed more time to work through. We ended up calling Newtek, the server farm, and having them help us out. Wayne was calling from the airport (heading on a trip) and didn't have all of his stuff with him. On a good note, because he wasn't at his home, the servers were denying him from getting access. That is good, but it wasn't good at the same time. That means that the firewall rules are working but it also meant that we had to call for help to get a new SSL installed and renewed. Kinda funny. |