Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Met up with Steve over the morning meeting. We did a little bit of catch-up and talked about a number of things. Lots of moving pieces and many of them are doing well and making progress. We talked about developers, reoccurring invoicing, new graphic work and options, and touched base on white label progress. We briefly looked at banks, payments not yet deposited, receivables, payables, and some verbal budgeting. We would like to increase some of the wages to those who are helping us (dependables). Wayne joined us and I started working with him. We were having a small server issue with one of the brand new servers (not yet released) that is being setup. It was losing itself on a redirect. We looked into it and Wayne started doing some wire shark and backend connection tests. I built a small testing page and passed it over to him via email. We got far enough that Wayne will take it from there. He is the master when it comes to the server side of things. I'm so grateful for his help. |