Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Logged into the morning GoToMeeting session with Steve. We went over a few updates and touched base on a few things. He is working with the Canadian's on some licensing agreements and building out the plant phases for elements of time (sub flags and tags - capable of doing sub phases and such). Shawn came over and Steve approved him to be put on at a 1/2% (0.005) of gross deposits. He was at 5% of those who used payroll, but this will be better for him and easier for me to calculate. After that, I pushed some of the main controller tables (data 0 as the master data set) back and forth between the servers and got all of the help files updated for the 2nd vendor stuff for both PO's and expense/receipts. After that, I worked with Shawn and we made a better plan for jumping into the sales tax expansion project. I broke the 13-14 different mini projects into about 5 basic steps. I then started going through and recording notes and info about the different projects and their phases. Trying to get the mother load broken down into bite size pieces. |