Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Assigned To: Brandon Moore
Created By: Brandon Moore
Created Date/Time: 5/17/2017 1:53 pm
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
Priority: 0
 
Time Id: 2661
Template/Type: Brandon Time
Title/Caption: Adilas Time
Start Date/Time: 5/31/2017 9:00 am
End Date/Time: 5/31/2017 12:00 pm
Main Status: Active

Sorry, no photos available for this element of time.


Uploaded Media/Content & Other Files (3)
Media Name   File Type Date Description
table_planning_for_mini_conversions.xlsx   Doc/Spreadsheet 5/31/2017 Table planning spreadsheet to help with the mini conversion project. This is a combined effort between Calvin Chipman's code and a brainstorming meeting between Brandon, Steve, and Eric. Trying to bring all of the pieces together. This is just the starting place.
brainstorming_on_mini_conversions.jpg   Image/JPEG 5/31/2017 Talking about mini conversions and how we want to tie things in. This graphic has a photo of Steve's exploratory stuff and how we are planning to help with the database and logic pieces.
scratch paper_r3_sub_inventory_mini_conversions.docx   Doc/Text 5/31/2017 Small file to help pull together tons of ideas on the mini conversion project. This is just the start of the process.


Notes:
On the morning GoToMeeting session. Steve and I started out the day going over plans and how much we need the next piece - called mini conversions. It seems to be the hottest topic currently. Of course, that always changes, but for now, it is the focal point. As part of talking about that, I showed Steve what Russell was planning for ecommerce. We talked about how we need to get things going in the right direction. Russell is planning a somewhat one-off version of what we are planning for the mini conversion section. We really don't want that to happen. It would end up hurting the client and causing more work and headache down the line. Russell's version would solve things on one end, but it would open up bigger holes later on. We just want to make sure we are all on the same playing field and same page.

On a side note, the last couple days have really been stressful due to the lack of control, planning, and standardization stuff. We really need to be one. Currently there are numerous goals, direction, and other things that are pulling us apart. It is very hard to manage the whole thing and hopefully we aren't trying to take too big of a bite.

Eric Tauer came on around 10 am. We then changed gears and started working on the planning phase for the mini conversion project. Steve and I took a bunch of notes and then started working through Calvin's code and database proposal stuff. We recorded as many notes as we could and then went into an Excel type format where we could build tables and simulate data flow and such. See attached for the rough notes and table layouts.