Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Assigned To: Brandon Moore
Created By: Brandon Moore
Created Date/Time: 7/25/2023 8:35 pm
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
Priority: 0
 
Time Id: 10350
Template/Type: Brandon Time
Title/Caption: Meeting with John
Start Date/Time: 7/24/2023 1:00 pm
End Date/Time: 7/24/2023 3:00 pm
Main Status: Active

click to enlarge - photo by: Brandon Moore - Adilas cafe main login screen - mock-up from John.
click to enlarge - photo by: Brandon Moore - Another mock-up from John on the adilas cafe - showing options to click into different corporations that you have been assigned to. Just mock-ups and concepting.
click to enlarge - photo by: Brandon Moore - This is a quick screen capture of the SWOT analysis that John and I were working on. This an Adobe XD document. Behind the scenes, we have over 100+ little bubble callouts and notes. We will go back and fix it up to make it look nice. Still scratch level.


Uploaded Media/Content & Other Files (1)
Media Name   File Type Date Description
swot_comments.docx   Doc/Text 7/24/2023 These are over 100+ comments that we tied to the SWOT analysis. In the actual Adobe XD document, we placed a pin (bubble note) by each of the points on the SWOT analysis. This only shows the comments, You can't really see what it is attached to. We'll circle back around and refine everything. This is pretty raw, we just wanted to get some of the ideas down.

The sort order on the doc is in reverse order. Without the numbers and what it was tied to, it makes it tough. Most of the items only have one bubble note per but some of them had 3 or 4 bubble notes per point on the SWOT analysis.

Not that it matters, but the top ones on this comments list (this doc) are tied to the bottom of the threats and then going up.


Notes:

Talking with John about the adilas cafe and doing some mock-ups on that interface. We went over some of the older stuff from Jonathan Wells, see entry from back in 9/5/19 for more info. We went over some new mock-ups from John (see attached). After that, we spent the rest of the time going over the SWOT analysis. Today we were finishing up the threats section. See attached for some progress stuff. It is still rough and unfinished, but we are making great progress.

We also got into talking about budgets, making sure that we go mobile first for fracture (adilas lite), and we setup some other times to meet. We are excited to have the first pass done on the SWOT analysis (see attached).