Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||
|
|
|
|
||||||
|
||||||
|
Notes:
|
• New 3D domain names. Email to the graphic designer, my dad, and Steve about digital billboard sites. Purchased these new domain names: 3dassemblyline.com, 3ddataassemblyline.com, playatthewall.com, 3deventtracking.com, and 3dracetracking.com. • On the phone with Steve, an intern, developer, and myself. The first part of the call was talking about sub categories for parts. See notes later on. After the developer left, we did a session on custom labels and showed Steve how to tweak the label settings. An intern then gave Steve a demo on the custom labels and barcodes that he did for a client. After that, Steve and I worked together on in-line discounts. We spent the rest of the time coding and building while doing some teaching. Great session. • Emails and tech support. • On the phone with a marketing contact going over a new custom project dealing with electronic billboards and menu boards. The client wants to interface between his menus and our point of sale system. • Helping an intern with his web/API documentation project. Reworking 2 new banners for Steve. The banners are for a trade show in November. • Finished up the 2 new banner graphics and sent some proofs to Steve. • Reviewing feedback from the advanced accounting training class. A rep sent me a recap of the surveys that were turned in. • New logo for client. • A developer came over and we got his laptop up to speed and all updated. He will be working on the adilas API socket project and wiring up the wall. |