Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Created By: Shannon Scoffield
Created Date/Time: 5/22/2014 3:52 pm
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
 
Time Id: 2233
Template/Type: Other Documentation
Title/Caption: Brainstorming & Tech - My Cart Favorites & Smart Groups
Start Date: 1/12/2012
Main Status: Active

click to enlarge - photo by: Shannon Scoffield -
click to enlarge - photo by: Shannon Scoffield -
 


Notes:
My Cart favorites “smart groups”
Things to try with these buttons:
1. All three group types
2. Nest group types
3. Add a group and don’t have any assignments to the group
4. Create one group type… then change the group type
5. Try using an enter sign (return key) or the quantity fields
6. Try different browsers
7. Delete an assignment
8. Inactivate an assignment
9. Change a rule
10. Try a group (smart group) without any rules
11. Try a smart group without any assignments
12. Try to copy a smart group button
13. Try to edit a smart group w/ & w/o the correct permission
14. What about a smart button that has one or more other buttons assigned to it as a group… hybrid… button group plus smart grid
My cart favorites URL – params
(See scans in photo gallery for 1/12/12)

New tables for the smart groups (continued):
(See scans in photo gallery for 1/12/12)
Rules: how things play
• Don’t allow dup assignments (parts to groups)
• Don’t allow gaps in the rules (start and end ranges)
• All ranges need to start at 0 and end at 99,999,999.99999
-Use 0 for total price (back into value) 1=price is really per… simple multiplication
-Use 1 for let the underlying part number control the tax category. Otherwise it will force the tax category to this master id.
In the future… this same scaling feature may be used in a build and hold type feature (mini manufacturing and on the internal build PO side). There is also a future option to do conversions.
Range, show 10 right off the bat, use java script to help show the next level… lock the entry points and only show the ending values. Do the math (according to decimal point accuracy… corp wide setting) and add either a .01, .001, .0001, or .00001 to the next starting value.
Rules (how things play) = sliding scale, pricing matrix, settings
Assignments (who gets to play) = items or part numbers that are assigned to the group, include the quantity on hand when in the grid…