Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||
|
|
|
|
|||
|
|||
|
Notes:
|
• Quick fixes on some data stuff for a couple of the custom interface pages. Light tech support stuff. • Working with an intern on a new project. He will be doing adilas photo galleries for deposits, vendors, user, and quotes. Those are the only 4 we have left out of the main 12 system players. Burning disks for the adilas interview with BATC. • New logo for a company. • Emails and tech support. Working with Newtek on SSL stuff for the data 1 and data 2 servers. • Working with an intern on helping files to go live. • On the phone with Steve talking about RFID tags and batches. Crazy stuff. • Brainstorming with the interns on batches, packages, RFID tags, and control numbers. Lots of discussion and lots of drawing and sketching on paper. Good session. • Copying and pasting 2013 tax tables to allow payroll for 2014. Still need to update and check state tax calcs. • Working on the new control number or lot/package number pieces. This is a special tie-in between PO’s, parts, and invoices. The goal is to help track groups and batches in a general sense. • Created an update file to add new columns to the database. • Pulling an all-nighter… major changes on chain of custody, RFID tags, batches, and control numbers. Added three new corp-wide settings and one new field on the PO invoice line items table. Close to 40 pages got tweaked to make the new settings work. |