Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||
|
|
|
|
|||
|
|||
|
Notes:
|
• Went into town to meet with the folks about tracking the Bear 100 runners and using adilas to do it. I watched and listened to what they had going on and how they were trying to fix it. They have fixed one of the pieces but also introduced tons of new requirements and variables into the puzzle. My presentation was a simple drawing and then a couple minute presentations of what adilas could do. I was having fun. My dad and two other guys were there. Good meeting. 30 miles. • Emails, phone calls, and tech support. • Working on a new set of pages to help document the current adilas pages. This is the start of the adilas API (Application Programming Interface). Planning out and adding new database tables to hold the documentation pages and information. Added eight new tables. One for the main page of function, one for modified log notes, page comments, page parameters, page results, page sub results, page samples (code), and a history table to record the changes made. |