Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||
|
|
|
|
|||
|
|||
|
Notes:
|
• Logged in and tested pages. Got a call from a client, he said that the Flash Check Write application wouldn’t work. I checked it and it had some hard coded URL variables and address stuff. Made those changes. Then the server started freaking out. I logged in and checked settings and rebooted things. I logged back in and then it went down again. We started getting calls and emails. Everybody got locked out of the system. I answered as many phone calls and emails as I could. Eventually I had to just leave them alone. I put up messages, auto cleared login counts, and made calls to tech support. Along with lots of prayers, the server tech at Newtek added a new database connection file, we restarted the server and it worked. Huge blessings! Sent out some emails to help inform some of the people. Went in to Smithfield to work with my sister and brother on adilas stuff. My sister and I had a session on the developer’s notebook. She showed me some files and scans. We also talked about how we are planning to sew things together. Good stuff. My brother showed me the progress he is making on editing the video from the first adilas training back in February 2013. It is coming along very good and he is getting into the flow of things. 15 miles. • Emails, tech support, and monitoring the server. Sent an email to the SBA Banker. Light introduction and a couple of flyers. • Scanning and documenting the revised operating agreement for adilas.biz. Posted files online. • Quick clean-up from this morning. Error messages, notes and auto clean-ups. |