Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
11/25/19: Drea's client had the idea to manually create a PO for the 5g and flex grid it back to the plant. That way the plant is still with its batch and available to be harvested with the rest of its weight. 11/20/19: Drea has a client who is non metrc who needs to pull 5 grams out of a plant but doesn't want to harvest the entire plant- wants to keep it with the rest of the batch. Currently there is no way to do this. Cory suggested harvesting the one plant, and keeping notes the entire way with the PO # for that plant to be able to track it and ultimately add its weight in on the final internal build. Not ideal, but that was what I came up with. |