Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
|||||||||
|
|||||||||
|
Notes:
|
Meeting with Chuck on the client facing scheduling stuff. We went over ideas for the MVP (minimal viable product). Talking about flow and structure. I took a number of screenshots (see attached). We also talked about how to deal with custom shuttles (unscheduled elements of time). After that, we rolled into what might come after the MVP rollout. We spent a little bit of time looking into the label builder and Chuck's new layout and prototypes. We got into some JavaScript stuff and looking at custom code to control a JavaScript canvas. We also looked into a mock-up of the custom label homepage that Chuck is working on. Bryan joined us and we switched back over to the client facing scheduling stuff and gave him a small walkthrough. |