Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Touching base on projects between Cory and I. Wayne was trying to connect but was having connection issues (he was driving). Once Wayne was able to jump on, he and Cory were going over back emails, client requests, testing plans, and projects. Not sure when, but most likely we will be needing a new primary email server here soon. That topic is gaining momentum and heat. We currently have a solution in place, but it feels like we are growing out of that shell (virtually). Dealing with the email server code, I need to gather things up and get a copy of those files over to Wayne for review. I'll just go grab them off of the old shared server and send them over to him in a zip file. He wants to look over the old code. It is not currently in our master code branch, because it gets deployed on a separate server. As a group, we talked about the next project for 710 Labs and Hoodie Analytics. They want a good daily inventory snapshot plus info on committed inventory (items that are on a transitional invoice - at the time of the report being pulled). We will try to get to this later this week or first part of next week. Towards the end of the meeting, both Wayne and Cory and Wayne and John were coordinating plans and meeting times between themselves. After Wayne left, John was giving Cory and I a small run down on the changes and plans for the discount engine. We are going to be putting a deadline on this one as of October 1st. We really need John to switch gears and help out with some payroll and end of year forms and what not. |