Basic Assignments
|
Options & Settings
|
Main Time Information
|
||||||||||||||||||||||||||||
|
|
|
|
Sorry, no photos available for this element of time.
|
|
Notes:
|
Eric popped in and we went over gift cards. He had made some small changes. We merged and tested some the pieces. I also talked to Eric about some needs coming down the pipeline for aggregates and deeper business intelligence (BI) levels. Eric was requesting deeper access to real database and SQL prompts on the test server. We talked about scheduled events, creating a manual trigger, and ways of getting at server logs and database logs. We talked about possible workarounds and getting things done. After Eric left, John and I looked at his GUI page for testing results for page re-works. Small code review session and merged in and pushed up the code to data 0. John went in and did some live testing. This is a new tool to track code review, page sign-off, and who tested what on the new pages. It's a graphical tool to show progress on code/page sign-off. Looks good. |